Completion Certificate Template for Contractors, Free PDF

Free job completion certificate template as a fillable PDF, with punch list, closeout checklist and sign-off for client and contractor. Sign it online.

Atualizado a 21 de outubro de 2026

Auto de receção

PDF preenchível para qualquer leitor de PDF. Ou inicie o modelo no Sealed Print: os campos de assinatura das duas partes já estão colocados.

A job completion certificate records that the client and the contractor walked through the finished work together and whether the client accepts it. It lists the open items on a punch list, the completion date and the closeout steps, and both sides sign it. At the top of this page you can download the completion certificate template as a free, fillable PDF. Fill it in on your computer or print it and take it to the final walkthrough.

What a certificate of completion does in construction

In construction, the certificate of completion is the document that closes a job. Contractors also call it a job completion form, a work completion certificate or a sign-off form. Whatever the name, it answers three questions in writing:

  • Is the work finished as agreed in the contract or estimate?
  • If not, what is left, and by when will it be done?
  • From which date do payment, warranty and responsibility for the site change hands?

There is no single federal form for private jobs. What the certificate must contain depends on your contract and, in some cases, on state rules for lien rights, retainage or home improvement contracts. On larger commercial projects, the parties often use an industry form such as AIA Document G704, the Certificate of Substantial Completion, which is issued by the architect. For remodeling, repair and smaller construction jobs, a simple completion certificate signed by the client and the contractor is the usual way to document the handover.

Substantial completion versus final completion

Many contracts distinguish two milestones:

  • Substantial completion: the work is complete enough that the client can use it for its intended purpose. Minor items may still be open. They go on the punch list.
  • Final completion: every punch list item is done, closeout documents are delivered and the final payment is due.

The template supports both. Tick "substantially complete and accepted, subject to the punch list" at the first walkthrough. Once the items are done, you can use a second copy of the form to record final completion, or mark each item as done and have both sides sign again.

Under many contracts, substantial completion is also the date from which the warranty period runs and from which delay damages stop. Check what your contract says, because the effect of the date depends on its wording.

What the completion certificate template includes

The template on this page is designed for construction, remodeling and repair work and fits on one to two pages.

SectionContent
Parties and projectClient or owner, contractor with license number, project address
ScopeContract or estimate number and date, work completed
WalkthroughWalkthrough date, completion date, people present
ResultComplete and accepted, substantially complete subject to the punch list, or not accepted (checkboxes)
Punch listNo., item and location, due date, done (checkbox)
CloseoutFinal inspection passed, manuals and warranties handed over, lien waivers received (checkboxes)
Payment and warrantyFinal payment due, warranty period and start date
Sign-offSignature of the client and of the contractor, with date and printed name

Punch list template: how to record open items

The punch list is the heart of the form. A clear punch list prevents most disputes at the end of a job, because it fixes what is still owed and by when. The template includes a punch list table with ten rows. For larger jobs, attach a separate list and refer to it.

A good punch list entry has four parts:

  1. A number, so that both sides can refer to the item in emails and invoices.
  2. What and where: "Paint touch-up, hallway ceiling next to the attic hatch" instead of "fix paint".
  3. A due date that both parties agree on during the walkthrough.
  4. A check when done, ideally confirmed by the client.

Take photos of each item and keep them with the certificate. They show the condition at the walkthrough better than any description.

How to fill in the job completion form

The PDF is fillable, for example in Adobe Acrobat Reader, in Preview on a Mac or in your browser.

  1. Enter the basics: names and addresses, the contractor's license number and the project address. Describe the work the same way it appears in the contract or estimate, for example "Kitchen remodel per estimate no. 1042 dated March 3".
  2. Walk the job together: check the work on site. List everyone who was present.
  3. Record each open item: one row per item, with location and due date.
  4. Tick the result: choose exactly one of the three options. If you choose "substantially complete", the punch list must not be empty.
  5. Go through closeout: final inspection by the building department where a permit was required, manuals and product warranties, keys and remotes, lien waivers from subcontractors and suppliers.
  6. Note payment and warranty: the amount and due date of the final payment and when the warranty period starts.
  7. Sign and exchange copies: both sides sign, and each keeps a copy.

Common mistakes

  • Signing "complete" with open items: if you accept the work without listing known defects, it can be harder to claim them later. Put everything you see on the punch list.
  • Vague items: "Tile issue" leaves room for argument. Name the room, the spot and what is wrong.
  • No due dates: without a date, nobody knows when the contractor must come back.
  • Forgetting lien waivers: in many states, unpaid subcontractors or suppliers can file a mechanic's lien against the property. Lien waivers help show that they were paid. The rules differ by state.
  • Final payment before the punch list is done: many contracts tie the final payment or the release of retainage to final completion. Check yours before you pay or invoice.

A completion certificate is evidence. It documents when the work was finished, in what condition it was accepted and which items were still open. Courts and insurers may look at it if there is a dispute about defects, payment or the start of the warranty. Fill it in completely and keep it with the contract, change orders and invoices.

For homeowners, some states have specific rules for home improvement contracts, such as required contract terms or licensing. In the UK and the EU, similar documents exist under other names, for example a practical completion certificate in the UK. This article is not legal advice. For large projects or disputed defects, talk to a construction attorney in your state.

Sign the job completion certificate online

Often not everyone can sign on site, or the certificate is typed up after the walkthrough. Instead of printing, signing, scanning and emailing it, you can send it for signature with Sealed Print by email link.

The Have it signed digitally button at the top of this page creates the template in Sealed Print. The signature, date and name fields for the client and the contractor are already placed. You enter names and email addresses, upload the filled-in PDF instead of the blank template if you like, and send the request.

  • Both sides sign on screen through their personal link, without an account, typed or drawn. That works on a phone at the job site too.
  • The finished PDF is sealed with timestamps and includes a signing certificate that shows who signed and when.
  • A verification code and a QR code on every page keep even the printout verifiable, for example in the project file.
  • Everyone involved receives the signed PDF by email, so each party has its copy.

Sealed Print creates simple electronic signatures. In the US, the ESIGN Act and UETA generally give electronic signatures the same effect as handwritten ones for most business documents, unless a law or your contract requires a specific form. Learn more about electronic signatures and the different types of electronic signature, or read how to sign a PDF. For conditions, see pricing.

Frequently asked questions

What is a job completion certificate?

It is a document in which the client and the contractor confirm that the work was inspected and whether it is accepted. It records open items, the completion date and the closeout steps. Both sides sign it, and each keeps a copy.

Who signs a certificate of completion for construction?

For private jobs, the client or property owner and the contractor sign it. On projects with an architect, the architect often issues the certificate of substantial completion, and the owner and contractor sign as well. Check your contract for who must sign.

What is the difference between a punch list and a completion certificate?

The punch list is the list of items that are still open or need correction. The completion certificate is the document around it: it identifies the parties and the work, records the result of the walkthrough and contains the signatures. In this template, the punch list is part of the certificate.

How do I write a letter of completion of work?

A short letter can work for small jobs: name the parties, the address, the work and the completion date, state that the work was completed as agreed and list any open items. A form like this template covers the same points in a fixed structure, so nothing is forgotten.

Can a completion certificate be signed electronically?

In most cases, yes. Under the ESIGN Act and UETA, electronic signatures are generally valid for business documents. If your contract or a specific law requires a particular form, check that first.

Does signing the certificate end the warranty?

No. In most contracts the warranty period starts at substantial or final completion. Signing the certificate usually sets that start date, so note it on the form.